Radio Remote Control System0 pages
Hubbell Industrial Controls, Inc.
Site Survey
Hubbell recommends a radio frequency survey
Hubbell Radio Remote Control Systems
prior to frequency selection by the customer. This
Work To Be
Performed
will insure that no other rf transmitters in the area
1. Hubbell service person-
Site Evaluation Program for RF Spectrum
are operating on this frequency. Also check for any
noise sources in the area.
Catalog 31.020 • November 1999 • New
nel will require the assistance of customer’s
It is suggested that a site plan be submitted to
Hubbell prior to the site survey for familiarization
with customer’s facility.
technician or engineer.
2. Hubbell will provide
all test equipment including a communications analyzer
(IFR model 1200,
Hewlett Packard
Model 8920A or
85907L).
3. Hubbell service personnel will cover the site
with customer representative. This will be to
determine what rf
signals are present
in the area.
Service personnel will
perform rf signal
strength measurements
Hubbell recommends a
Site Survey should be
performed prior
to frequency
selection for a
Radio Control or
Radio Communication
System.
throughout the operating area. The need
for repeater units will
also be determined.
4. The customer will be
given a preliminary
report at the job site.
A final report will be
issued within five working days after returning
to the factory.
5. A site survey will usu-
HUBBELL
Hubbell Industrial
Controls, Inc.
a subsidiary of
Hubbell Incorporated
JPS-1199-1M © 1999
Printed in U.S.A.
ally take about one
50 Edwards Street
Madison, Ohio 44057
(440) 428-1161
Fax (440) 428-7635
4301 Cheyenne Drive
Archdale, NC 27263
(336) 434-2800
Fax (336) 434-2801
day. Price will be in
accordance with
Hubbell’s Field Service
Rates and Terms, Bulle-
http://www.hubbell-icd.com/radiocontrols/
tin 1000A.
HUBBELL
"