Haliade 150-6MW offshore wind turbine0 pages
WIND PRODUCT SOLUTIONS
Haliade™ 150-6MW
Offshore wind turbine
Alstom, a key player in
power generation, offers
a new generation, high
yield offshore wind turbine.
Uncompromising on
reliability and designed
for ease of installation,
the turbine lowers the cost
of offshore energy.
High yield, uncompromising reliability
Building upon its ALSTOM PURE TORQUE® technology for reliability, Alstom has
developed an offshore 6 MW direct-drive wind turbine suitable for all offshore
conditions. Proven technology and innovation are combined to deliver market-leading
cost efficiency.
The turbine incorporates dedicated offshore technology in collaboration with some
of the industry’s leading component suppliers. There can be no compromises on a
power-generating product that operates in the industry’s most challenging
environmental conditions.
Technical Overview
A distribution cabinet in the nacelle
supplies power and signals to pitch, yaw
and cooling fans and collects signals
from all system sensors.
The Haliade™ 150-6MW is a
threebladed wind turbine with a 150 m
diameter rotor and a rated power
of 6 MW.
RPWR/PRSHT/HLD150-6MW/EN/2.2014/FRA/1954
The turbine has been designed following
Class I-B specifications of the standards
IEC-61400-1 / IEC-61400-3.
It is suitable for sites with a reference
wind speed of 50 m/s (10 minutes
average) and a 50-year extreme gust
speed of 70 m/s (3 seconds average).
Alstom’s Haliade™ 150-6MW
has been key in winning
3 projects for the installation
of 240 wind turbines off
the coast of France.
This innovative technology
helps drive down the cost of
electricity and we believe this
6 MW turbine is positioned as
the market reference in the field
of offshore wind worldwide.
Béatrice Buffon,
Deputy General Manager
of EDF EN France
The Haliade™ 150-6MW is equipped
with a direct-drive permanent magnet
generator and three identical full-power
converters operating at 900 V each.
This voltage is increased by means of
a transformer included in the turbine.
The inverter, transformer, switchgear and
low voltage electrical distribution cabinet
are located at the tower base.
1st onshore
turbine
installation
2012
Power curve
certification
The wind turbine is air-cooled and
pressurised. Construction materials and
protection treatments are specifically
designed for offshore environments.
Heat exchangers and pressuring
units prevent salty air entering while
dehumidifiers prevent corrosion of
components inside the wind turbine.
Enabling supply of power to
the equivalent of about
5,000 households
1st offshore
turbine
installation
2013
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it
is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is
subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.
Full
certification
2014
Pre-series
& series
production
2015
"